A442 Stirchley to Randlay​

Client: Balfour Beatty Living Places Ltd

Location: A442 Stirchley to Randlay, Telford

Date: Feb 2020 – June 2020

Value: £302k

Scope of Work:

These works involved highway reconstruction and drainage improvements to a high-speed dual carriageway in Telford. Our works involved the excavation of the existing highway to the formation layer and structural and drainage improvements.

In order to be able to retain the existing levels we worked with the client to value engineer a solution that involved the installation of Tensargeotextile membrane enabling the removal of the capping layer below the sub-base. This enabled us to save on additional excavation works whilst at the same time retaining the existing levels. A new formation was formed and compacted on top of the geotextile consisting of a new sub-base layer before installation of the final surfacing.

The scheme also involved of the installation of new splay kerbing and improvements to the highway drainage consisting of the removal and replacement of a filter drain to the rear of the kerbs.

A442 Stirchley to Randlay

QUESTIONS?

At GN Groundworks Ltd, we provide a complete groundworks and civil engineering service for commercial clients and Tier 1 contractors across the Midlands. As a quality assured business our skilled workforce deliver our projects to the highest standards. Call us today with your enquiries on 01952 501 665 or through the Contact page